Monday, 10 a.m.: “Just do it like last time”

In my second year as a freelancer, I picked up an event-poster project from a café near West Lake in Hangzhou. The client sent, “Use the same feeling as last time,” but didn’t specify the dimensions, final files, or number of revisions. I forced myself to start anyway. Three days later, I was asked to redo the layout. That was when I realized the most time-consuming part wasn’t the production—it was that our standards had never actually matched.

What the requirements sheet does: turns vague requests into checkable details

This isn’t a template I expect anyone to copy exactly. It’s a checklist I send the client to confirm: deliverables, purpose, dimensions, deadline, included revisions, and which materials the client will provide. Once they confirm it, we quote and start. My friend Lin Yue, who runs a small brand consultancy in Guangzhou, started attaching the sheet to her initial conversations and has already avoided two rounds of pointless rework. I also wouldn’t treat it as a strict contract; for a small team, one page is enough. If the client won’t cooperate, I can first repeat the requirements verbally and then ask them to reply with confirmation.

Replicating it today: free, about 30 minutes, with copy-and-paste as the only skill

Cost: zero. I can use Word, Feishu, or an online document. Time: about 30 minutes to set it up the first time, then roughly 10 minutes each time I send it. Technical barrier: no coding; I only need to copy and paste. First step: open the document tool I already use, create a new page, copy over five fields—“Deliverables, Dimensions, Deadline, Number of Revisions, Materials Needed from Client”—fill in the current order details, then send it to the client for confirmation item by item. I messed this up too: I made the form so complicated that clients skipped it. After I cut it down to one screen, I started getting replies more often.

Here’s how I’d use it at different stages

When I was just starting, I would add three fields—Deliverables, Number of Revisions, and Deadline—to avoid making promises I couldn’t explain clearly. Once I had one or two regular clients, I’d put the confirmation sheet beside the quote and send both at the end of every conversation. While scaling up, I’d create two or three fixed checklists by project type so new teammates could fill in the blanks before starting. Not every order needs this tool; for simple work or clients I know well, a single sentence may be enough. There’s no pressure to try the whole setup now either. Writing down the one detail most likely to trigger rework can already prevent misunderstandings.