The first time I put client requirements on one page, I realized I had misunderstood them

Last Wednesday night, I was preparing a quote in Hangzhou for a six-person design team. They wanted a system that could “automatically organize feedback.” I wrote a two-page feature list, but they kept asking one thing: “Can we use it today?” After revising the quote the next day, they still did not give the green light. I got stuck there too: I thought I was missing features, when what I actually lacked was a validation order. So I tried GRH Lean, breaking the large request into a few small questions we could confirm the same day.

It does not write your proposal; it confirms the next step

GRH Lean is a requirements-validation method proposed by Anthropic. The core is simple: explain the assumption in a short note, then have a real user complete the smallest possible action, rather than having the team start building a full system. Xiaolin, an independent developer in Shanghai, handles outsourced WeCom customer-service work. She used the method to have a client record 10 real inquiries before deciding whether to build “classification reminders” or “automated replies.” In her shared office on Tuesday morning, she did not write any code first. She took a classification sheet and interviewed the client for 30 minutes.

Replicate it today: 0 yuan, about 1 hour, no coding barrier

I opened the project’s GitHub page and downloaded the streamlined process from the README. The first step was to click the Code button, copy the content, and paste it into a notes or document tool. It cost 0 yuan and took about 1 hour to complete one requirements pass. The technical barrier was simply being able to explain how clients currently handle the problem. It does not guarantee a sale; it reveals which assumptions in the request remain unvalidated. If a project is urgent, I can also use it to check an existing requirements document rather than following every step from scratch.

Different team sizes, different ways to use it

When I was just starting out and did not have stable clients, I would use it once to organize my own assumptions, then interview someone I knew for 20 minutes instead of rushing to build a system. With one or two clients already, I would put the questions they repeatedly raise into a Lean sheet, validate one key point at a time, and only then decide whether to charge more for development. While scaling, I would have sales, delivery, and development share the same validation record, reducing the friction behind “sales promised it, but delivery cannot build it.” Not every team needs GRH Lean. There is no rush to try it; when requirements spark another endless team debate, it will still be there.